CCDC Pioneer Pathway
Project Size: 1 acre
Client(s): Capital City Development Corporation
Principal(s) in Charge: Doug Russell
Project Status: Completed
Commissioned by Capital City Development Corporation (CCDC), The Land Group developed construction drawings as required to extend the Pioneer Pathway with decorative modular pavers, linking West River Street to the Boise River Greenbelt. Also included was pathway lighting and decorative benches. The partnership with CCDC and Boise Parks was instrumental in making this exciting connection. Construction of this project was completed in Spring, 2016.