Bogus Basin Trailhead

 

Project Size: 0.7 acres

Client(s): Idaho Land Trust of the Treasure Valley

Principal(s) in Charge: Doug Russell

Project Status: Completed

The Land Group conducted a topographic survey of the approximately 0.7 acre site. The survey documented the elevations of the existing ground, existing improvements, and other features pertinent to design.  With this thorough survey, TLG designed and located the proposed trailhead. The design included steps and large natural boulder retaining walls required to attain the elevation needed to start the switchback trails.  Many design development efforts such as CAD detailing and 3D mock ups were carried out to ensure a precise on-site installation. This project was a donated service to The Land Trust of Treasure Valley and to the community.